Bowling Green Central Heating Costs & Prices
Bowling Green, Kentucky. The Bowling Green Central Heating Cost Report is a concise report on everything you need to know about the cost of central heating in the Bowling Green area.
|
Average Central Heating Cost in Bowling Green
We have done a little research to find the average cost of central heating in Bowling Green. Here are the average costs and prices reported back to us:
Cost of Forced Air Furnace Installation in Bowling Green, Kentucky$2,765.90 for 80,000-100,000 btu gas furnace (mid-efficiency; 80-84% afue) (Range: $2,448.90 - $3,082.89) Free Estimates from Local ProsCost of Forced Air Furnace Repair in Bowling Green, Kentucky$99.78 for a furnace tune-up (Range: $86.17 - $113.38) Free Estimates from Local ProsCost of Boiler Installation in Bowling Green, Kentucky$2,641.64 for 80-120 mbtu/hr gas boiler (mid-efficiency, 80-84% afue) (Range: $2,244.83 - $3,038.45) Free Estimates from Local ProsCost of Electric Baseboard/Wall Heater Installation in Bowling Green, Kentucky$199.60 per heater (about 6 ft. long) (Range: $171.51 - $227.68) Free Estimates from Local Pros |
Was
this information helpful?
|
Bowling Green Central Heating Cost Data
Professionals in the Bowling Green area have provided information about how much central heating cost(s). Here are some of the individual reports:
42101, Bowling Green, Kentucky - September 1, 2021
Boiler Installation$2,244.83 - $3,038.45 for 80-120 mbtu/hr gas boiler (mid-efficiency, 80-84% afue) Includes pricing for gas boiler installation. Cost takes into account 100,000 BTU boiler with 80-84% AFUE rating. Excludes installation of new piping, radiators and baseboards.
Reported by: ProMatcher Research Team |
42101, Bowling Green, Kentucky - December 7, 2020
Electric Baseboard/Wall Heater Installation$171.51 - $227.68 per heater (about 6 ft. long) Labor is included in this installing an electric baseboard heater estimate. Price accounts for hard-wiring a single electric heater (72-inches long; heats up to 250 sf) and mounting it to the wall with the appropriate hardware. Additional charge for upgrading the electrical panel, thermostat installation, covers, higher capacity heaters (over 1500 watts), extensive re-wiring, insulation, and other HVAC work.
Reported by: ProMatcher Research Team |
42101, Bowling Green, Kentucky - September 7, 2020
Forced Air Furnace Repair$86.17 - $113.38 for a furnace tune-up Labor is included in this routine furnace service cost. Does include inspecting all components of the forced air system, testing and adjusting furnace for efficiency and safety, and lubricating motor components. Estimate does not include making repairs, replacing broken equipment, or replacing filters.
Reported by: ProMatcher Research Team |
42101, Bowling Green, Kentucky - July 12, 2018
Forced Air Furnace Installation$2,448.90 - $3,082.89 for 80,000-100,000 btu gas furnace (mid-efficiency; 80-84% afue) This estimated cost includes furnace installation labor. Price estimate includes 80,000 BTU gas furnace with 80-84% AFUE rating. Items excluded: installation of ductwork.
Reported by: ProMatcher Research Team |
|
|
|
|