Albuquerque Central Heating Costs & Prices
Albuquerque, New Mexico. The Albuquerque Central Heating Cost Report is a concise report on everything you need to know about the cost of central heating in the Albuquerque area.
|
Average Central Heating Cost in Albuquerque
We have done a little research to find the average cost of central heating in Albuquerque. Here are the average costs and prices reported back to us:
Cost of Forced Air Furnace Installation in Albuquerque, New Mexico$3,127.27 for 80,000-100,000 btu gas furnace (mid-efficiency; 80-84% afue) (Range: $2,768.85 - $3,485.68) Free Estimates from Local ProsCost of Forced Air Furnace Repair in Albuquerque, New Mexico$112.81 for a furnace tune-up (Range: $97.43 - $128.19) Free Estimates from Local ProsCost of Boiler Installation in Albuquerque, New Mexico$2,986.77 for 80-120 mbtu/hr gas boiler (mid-efficiency, 80-84% afue) (Range: $2,538.11 - $3,435.43) Free Estimates from Local ProsCost of Electric Baseboard/Wall Heater Installation in Albuquerque, New Mexico$225.67 per heater (about 6 ft. long) (Range: $193.92 - $257.42) Free Estimates from Local ProsCost of Electric Baseboard or Wall Heater Repair in Albuquerque, New Mexico$90.00 per hour (plus materials) (Range: $85.00 - $95.00) Free Estimates from Local Pros |
Was
this information helpful?
|
Albuquerque Central Heating Cost Data
Professionals in the Albuquerque area have provided information about how much central heating cost(s). Here are some of the individual reports:
87101, Albuquerque, New Mexico - September 1, 2021
Boiler Installation$2,722.50 - $3,685.00 for 80-120 mbtu/hr gas boiler (mid-efficiency, 80-84% afue) Manhours for gas boiler installation are included. Estimate includes 100,000 BTU boiler with 80-84% AFUE rating. However, it does not include installation of new piping, radiators and baseboards.
Reported by: ProMatcher Research Team |
87101, Albuquerque, New Mexico - December 7, 2020
Electric Baseboard/Wall Heater Installation$208.01 - $276.12 per heater (about 6 ft. long) Cost range takes into account installing an electric baseboard heater labor. No additional charge for hard-wiring a single electric heater (72-inches long; heats up to 250 sf) and mounting it to the wall with the appropriate hardware. Items excluded: upgrading the electrical panel, thermostat installation, covers, higher capacity heaters (over 1500 watts), extensive re-wiring, insulation, and other HVAC work.
Reported by: ProMatcher Research Team |
87101, Albuquerque, New Mexico - September 7, 2020
Forced Air Furnace Repair$104.50 - $137.50 for a furnace tune-up Labor for furnace tune-up is included in the price. Accounts for cost of verifying furnace is working safely and properly, checking for air leaks, making necessary adjustments, lubricating motor, and inspecting filters Cost does not account for replacement filters, repairs, and replacement parts.
Reported by: ProMatcher Research Team |
87113, Albuquerque, New Mexico - December 10, 2019
Electric Baseboard/Wall Heater Installation$85.00 to $95.00 per hour (labor only) We charge a 40 trip charge. Then $85 per hour.
Reported by: John Weaver, Active Electric Inc |
87113, Albuquerque, New Mexico - December 10, 2019
Electric Baseboard or Wall Heater Repair$85.00 to $95.00 per hour (plus materials) We charge a 40 trip charge. Then $85 per hour.
Reported by: John Weaver, Active Electric Inc |
87101, Albuquerque, New Mexico - July 12, 2018
Forced Air Furnace Installation$2,970.00 - $3,738.90 for 80,000-100,000 btu gas furnace (mid-efficiency; 80-84% afue) This quote takes into account the cost of forced air furnace installation. It includes mid-effiency, 80,000 BTU gas furnace. Price excludes duct work installation or repair.
Reported by: ProMatcher Research Team |
87124, Rio Rancho, New Mexico - September 1, 2021
Boiler Installation$2,353.72 - $3,185.85 for 80-120 mbtu/hr gas boiler (mid-efficiency, 80-84% afue) Estimated quote includes gas boiler heating system installation. Also includes 100,000 BTU gas-fueled boiler with 80-84% AFUE rating. Cost does not take into account repair or installation of radiator or baseboard units.
Reported by: ProMatcher Research Team |
87124, Rio Rancho, New Mexico - December 7, 2020
Electric Baseboard/Wall Heater Installation$179.83 - $238.72 per heater (about 6 ft. long) Cost includes installing an electric baseboard heater. Includes hard-wiring a single electric heater (72-inches long; heats up to 250 sf) and mounting it to the wall with the appropriate hardware. Items excluded: upgrading the electrical panel, thermostat installation, covers, higher capacity heaters (over 1500 watts), extensive re-wiring, insulation, and other HVAC work.
Reported by: ProMatcher Research Team |
87124, Rio Rancho, New Mexico - September 7, 2020
Forced Air Furnace Repair$90.35 - $118.88 for a furnace tune-up Price includes labor for furnace tune-up. Items included: visual inspection of furnace system for safety and performance issues, lubricating moving parts, looking for blockages and leaks, and checking filters. Cost does not take into account replacement filters, repairs, and replacement parts.
Reported by: ProMatcher Research Team |
87124, Rio Rancho, New Mexico - July 12, 2018
Forced Air Furnace Installation$2,567.70 - $3,232.45 for 80,000-100,000 btu gas furnace (mid-efficiency; 80-84% afue) This estimated price includes forced air furnace installation labor. Cost accounts for mid-effiency, 80,000 BTU gas furnace. Does not include duct work installation or repair.
Reported by: ProMatcher Research Team |
|
|
|
|
Albuquerque Heating Contractors
Active Electric Inc 8612 paseo Alameda, Albuquerque, NM 505-238-5383
|
Petroglyph Plumbing & Heating 8248 Meadowbrook Ave NW, Albuquerque, NM 505-352-1169
|
Daniels Heating and Air Conditioning, LLC 6650 2nd Street Northwest, Albuquerque, NM 505-898-8860
|
|
|
|